It would be convenient it Revit reported the overall length of the walkthrough path in the properties. This way we can quickly evaluate what we need to adjust to arrive at a desired pace for the AVI. Perhaps, better yet, specify the pace (ft/sec) and Revit figures it out parametrically as the walkthrough is modified.