    Hello all,

    I am in the process on creating schedules and have a question, Is there a way to set up in the schedule to add notes to the bottom of the schedules per attached. or looking for another way to accomplish

    Thanks,
    Attached Images Attached Images

  2. #2
    All AUGI, all the time archjake's Avatar
    Join Date
    2003-07
    Location
    Tucson, AZ
    Posts
    531
    Login to Give a bone
    0

    Default Re: PROVIDING NOTES AT BOTTOM OF SCHEDULE

    To date it is not possible to add notes to the bottom of a schedule.

    I typically will place a drafting view below the schedule or you could use a Key Schedule for the notes. It will align / snap with one side of your schedule when they are placed on a sheet but you will half to eye the other side to match the width.

  3. #3
    Active Member
    Join Date
    2010-06
    Posts
    62
    Login to Give a bone
    0

    Default Re: PROVIDING NOTES AT BOTTOM OF SCHEDULE

    Since it is not possible I'm sure some one has come up with a different solution when using a revit schedules looking for ideas on different ways to handle and still utlize the smarts of the program

    Thoughts,

  4. #4
    I could stop if I wanted to
    Join Date
    2009-01
    Posts
    345
    Login to Give a bone
    0

    Default Re: PROVIDING NOTES AT BOTTOM OF SCHEDULE

    We use text on the sheet.

  5. #5
    I could stop if I wanted to
    Join Date
    2009-11
    Posts
    380
    Login to Give a bone
    0

    Default Re: PROVIDING NOTES AT BOTTOM OF SCHEDULE

    I use a drafting view called "Door Notes" or "Window Notes", etc. and put it on the bottom of the sheet far below the schedule.

  6. #6
    Member
    Join Date
    2011-01
    Posts
    14
    Login to Give a bone
    0

    Default Re: PROVIDING NOTES AT BOTTOM OF SCHEDULE

    Some firms have just moved their notes to the top of the schedule.
    Create a custom header and "group" it with the header-less Revit schedule.

  7. #7
    Member
    Join Date
    2011-07
    Posts
    12
    Login to Give a bone
    0

    Default Re: PROVIDING NOTES AT BOTTOM OF SCHEDULE

    For all the functionality... really, this is not doable? Jeesh.

  8. #8
    AUGI Addict cdatechguy's Avatar
    Join Date
    2006-10
    Location
    CdA, ID
    Posts
    1,533
    Login to Give a bone
    0

    Default Re: PROVIDING NOTES AT BOTTOM OF SCHEDULE

    Quote Originally Posted by Super T View Post
    For all the functionality... really, this is not doable? Jeesh.
    It's a data table.. notes are not data, its "fill in the blank"... Legends work great for stuff like this.

    If you were still using Excel and put notes at the bottom of the schedule then someone said they wanted everything sorted a differently what happens to those notes if you don't lock them down? Same issue with Revit...everything is sorted a certain way.
    Michael "MP" Patrick
    "I only drink :coffee: until it's acceptable to drink :beer: or :whiskey: or :wine:"

Similar Threads

  1. Total at bottom of schedule
    By Bryan Thatcher in forum Revit Structure - General
    Replies: 1
    Last Post: 2010-08-25, 03:11 PM
  2. General Notes Note Block/Schedule?!?
    By jhectorne in forum Revit Architecture - General
    Replies: 3
    Last Post: 2008-10-22, 12:11 AM
  3. Notes at bottom of Schedule Table
    By buzz in forum AMEP General
    Replies: 6
    Last Post: 2007-12-17, 09:05 PM
  4. Typical/ General Notes using schedule styles?
    By bgoldman in forum Revit Architecture - General
    Replies: 1
    Last Post: 2007-02-23, 02:43 PM
  5. ADT Schedule notes?
    By .chad in forum ACA General
    Replies: 2
    Last Post: 2006-11-30, 02:38 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •