Im having issues getting my elevations (currently showing actuall above sea level elevations) to match the architects elevations ( currently showing elevations from a 100 mark). The architect set up a new site location in there model to get there elevations to change from above sea level to the 100 mark. The model locations have not changed and currently linked correctly but when i set my elevation base for all my elevation levels and spot elevations to shared instead of project they dont change to match. The shared coordinate system is synchronized (at least when i aquire them i get a pop up box that tells me the shared coordinate system is already synchronized) so everything seems to be setup properly. I have done this before in the past and it usually works but this one time it seems to not work. If anyone has any ideas i would appreciate it!!!