    Default Mechanical Equipment and shared parameters. How much data is in your equipment?

    How much information are you placing inside your mechanical equipment (electrical and plumbing too). Just curious to see if your loading up your AHUs, VAVs, condensors, ERVs, water heaters, chillers, boilers, storage tanks, etc.....

    Are you using the data for schedules only or calculating the values for performance and energy information?

    Thanks!

  2. #2
    Member
    Join Date
    2011-12
    Posts
    12
    Login to Give a bone
    0

    Default Re: Mechanical Equipment and shared parameters. How much data is in your equipment?

    We generally only go as far as placing the necessary information for scheduling. Our firm would love to take the next step and calculate efficiency, performance, etc. (great for LEED!), but we tend to be limited by the scope of the other trades we work with. E.g. if the architect is only fleshing out "typical floors" we don't have enough information to model the building and see how the equipment interacts.

    Speaking of- some of our newer engineers are just getting into Revit and equipment modeling. Anyone know a good resource / tutorial to point them towards with some step-by-step examples on how to construct their own HPs, AHUs, split systems, etc? It'd be appreciated.

  3. #3
    I could stop if I wanted to
    Join Date
    2015-09
    Posts
    481
    Login to Give a bone
    0

    Default Re: Mechanical Equipment and shared parameters. How much data is in your equipment?

    Thank you!

    As far as a guide goes for creating mechanical equipment. I think knowing the best practices for family creation in general are a good starting point. Being able to setup your reference lines and dimensions are crucial for these kinds of families. That and knowing how to setup a type catalog can be helpful.

    If someone has a guide though that would be great to see!

  4. #4
    Woo! Hoo! my 1st post
    Join Date
    2010-10
    Posts
    1
    Login to Give a bone
    0

    Default Re: Mechanical Equipment and shared parameters. How much data is in your equipment?

    The attached pdf is a helpful tutorial in creating new equipment. I've referred to it quite frequently even for creating simple equiment that doesn't need the parametric values.

    Hope this helps.

  5. #5
    100 Club
    Join Date
    2009-12
    Posts
    109
    Login to Give a bone
    0

    Default Re: Mechanical Equipment and shared parameters. How much data is in your equipment?

    We are using them for scheduling mechanical equipment, and motor circuit schedules. The only downside is the typical notes that apply on the schedules, they need to be added seperatly as they cannot be placed in the schedule. We are not however using the mechanical and plumbing connectors to do anything with those systems just the electrical connectors being linked to our parameters for the panel schedules.

Similar Threads

  1. Mechanical Equipment Tag w/ GPM
    By ThatBIMGuy in forum Revit MEP - General
    Replies: 5
    Last Post: 2012-03-09, 06:29 PM
  2. Replies: 4
    Last Post: 2012-01-31, 08:05 PM
  3. Replies: 0
    Last Post: 2011-12-09, 04:32 PM
  4. Replies: 3
    Last Post: 2010-11-11, 02:59 PM
  5. Need help with mechanical equipment tag
    By EddieFromDc in forum Revit MEP - General
    Replies: 5
    Last Post: 2010-08-09, 02:07 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •