Summary: Be nice to have the load name for dedicated circuits automatically fill in with the connected equipment name.

Description: If I circuit a roof top unit to a panel I'd like the panel schedule to fill in the description based on a parameter in the connected equipment (so the panel schedule would say "RTU-1", for example). Basically the same functionality that happens when you circuit a sub panel to another panel - the panel schedule fills in with the panel name - as opposed to the space name/number.

Product and Feature: Revit MEP - MEP Electrical Panel Schedule - (Electrical)

Submitted By: Armand Marshall on 10/13/2012