Results 1 to 1 of 1

Thread: AB404-2L: Schedules for all Phases of Your Work in Autodesk® Revit® Building

  1. #1
    Autodesk, Inc. Autodesk University's Avatar
    Join Date
    2012-11
    Posts
    3,030

    Default AB404-2L: Schedules for all Phases of Your Work in Autodesk® Revit® Building

    Instructors: Cyril Verley RA with Robert Mencarini and Patrick Davis

    Class Description: The focus of this class is how to effectively use Schedules within Revit 2007. For architects, schedules can serve as key design, management, and organizational tools throughout all phases of a project. The presentation is primarily designed for project managers and other intermediate to advanced Revit users. The beauty of schedules is that they allow project team members and project managers to make major design and/or construction document edits at a project-wide level from a spreadsheet view. Through gaining a better understanding of the uses of Schedules, you will be able to better understand the scope of your project in a convenient, highly organized, and easy-to-utilize format.
    Attached Files Attached Files

Similar Threads

  1. AB218-6: Large Team Project Work Flows in Autodesk® Revit®: Autodesk Consulting
    By Autodesk University in forum Architecture and Building Design
    Replies: 0
    Last Post: 2014-11-30, 01:21 PM
  2. AB404-1: Autodesk® Revit®: Beyond Documentation
    By Autodesk University in forum Building Design
    Replies: 0
    Last Post: 2013-05-05, 03:18 AM
  3. Replies: 0
    Last Post: 2013-04-17, 04:44 AM
  4. Replies: 1
    Last Post: 2008-12-18, 04:21 PM
  5. Revit Mechanical / Revit Building and Autodesk Building Systems
    By danielmapes in forum CAD Management - General
    Replies: 2
    Last Post: 2006-02-24, 01:19 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •