Results 1 to 1 of 1

Thread: CV114-2: Cut to the Sub-base

  1. #1
    Autodesk, Inc. Autodesk University's Avatar
    Join Date
    2012-11
    Posts
    3,030

    Default CV114-2: Cut to the Sub-base

    Instructor: Christina A. Davis

    Class Description: Existing surface? Check. Corridor, proposed surface? Check, check. Volume report? Zero! Quantity takeoffs are a vital part of the estimating process and AutoCAD Civil 3D has the tools you need to get the numbers you want. This class will walk you through the Civil 3D process for calculating earthwork volumes and material takeoffs using surfaces and corridors. We'll dig through the missteps that cause zero volumes and cut right to the sub-base.
    Attached Files Attached Files

Similar Threads

  1. 2015: Level head family that shows both Project Base and Survey Base
    By david_peterson in forum Revit Architecture - General
    Replies: 1
    Last Post: 2015-05-28, 04:11 AM
  2. CV114-5: BIM for Civil
    By Autodesk University in forum Civil Infrastructure
    Replies: 0
    Last Post: 2014-12-01, 04:40 AM
  3. CV114-3L: Building the Perfect Template
    By Autodesk University in forum Civil Infrastructure
    Replies: 0
    Last Post: 2014-12-01, 04:36 AM
  4. CV114-3: Go "AWOL": Adept Without Land
    By Autodesk University in forum Civil Infrastructure
    Replies: 0
    Last Post: 2013-05-05, 03:22 AM
  5. Structural - Grade Beam, Coulmn Base, Base Plate
    By roberthale76111940 in forum Dynamic Blocks - Sharing
    Replies: 1
    Last Post: 2006-07-25, 01:21 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •