Results 1 to 2 of 2

Thread: Attacher arrow delay....

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Member
    Join Date
    2007-04
    Posts
    2
    Login to Give a bone
    0

    Default Attacher arrow delay....

    We've noticed on our systems a delay in the attacher arrow connecting to objects. We're also noticed in a multi view window a delay in jumping from one view to the next. Thoughts anyone?

  2. #2
    100 Club
    Join Date
    2011-08
    Posts
    109
    Login to Give a bone
    0

    Default Re: Attacher arrow delay....

    If I remember correctly, when applying the attacher arrow, the software is reading the database. If you have lag back to your database (e.g. a slow connection to a networked database) this could slow you down. When my database was stored across town and only accessible via a WAN, attacher arrow might take 10-15 seconds to load. Moving the database to a local installation sped me up enormously.

Similar Threads

  1. flip left arrow or right arrow
    By Wish List System in forum AutoCAD Wish List
    Replies: 2
    Last Post: 2012-07-18, 03:43 AM
  2. Replies: 6
    Last Post: 2009-07-20, 07:10 AM
  3. Attacher un mur à un toit
    By atelierba in forum Revit - FAQ (Read only)
    Replies: 0
    Last Post: 2009-03-02, 03:02 PM
  4. attacher des géometrie
    By esbeeditions in forum Revit Architecture - General
    Replies: 13
    Last Post: 2008-05-07, 09:21 AM
  5. Attacher des murs
    By Valou in forum Revit Architecture - General
    Replies: 4
    Last Post: 2007-12-03, 10:14 AM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •