Thread: Combining material takeoff schedules / calc grand total for entire project in 1 schedule.

  1. #1
    Woo! Hoo! my 1st post
    Join Date
    2014-04
    Posts
    1
    Login to Give a bone
    0

    Exclamation Combining material takeoff schedules / calc grand total for entire project in 1 schedule.

    hi all!

    i would like to do a simple cost calculation for building treehouses.

    i have 2 "material types" i use:

    1: beams wich are priced in m³
    2: wooden boards and roofing material that are priced in m²

    so i can make different schedules for each type (walls, floors, roofs and beams) and calculate the total cost per schedule and per type like this:

    1.JPG

    but the more types i add, the more schedules i have and the more i have to still manualy make the sum of all total costs for every schedule.
    but i want to have 1 big schedule / list that combines all these types so i have only ONE grand total (the gand total of the entire project's material takeoff.)

    the way i tried this is by making a multi category schedule but then there's a big problem when calculating the costs.

    if i use a multiple category schedule and add the material volume & material area and create a material total area cost column & a material total volume cost column then the schedule will calculate the volume cost AND area cost for every material!

    but some materials only need to be calculated for volume and other only for area.
    if i make a combined schedule then it will calculate the volume AND area for ALL materials and the grand total price is totaly WRONG!

    like this:

    2.JPG

    I hope someone understand what i'm trying to do and give me some advise on how to do it with Revit.

    also excuse me for my English as it is not my native language.
    also the screenshots are partly in English and partly Dutch, but i hope the idea is clear about what i'm trying to do.

    ALOT OF THANKS IN ADVANCE!!!!

  2. #2
    Certifiable AUGI Addict dhurtubise's Avatar
    Join Date
    2005-07
    Location
    Somewhere in the BIM world
    Posts
    3,792
    Login to Give a bone
    0

    Default Re: Combining material takeoff schedules / calc grand total for entire project in 1 schedule.

    I'd simply create 2 schedules. One for Beams and one for wooden boards

Similar Threads

  1. 2014: Can you eliminate a column grand total in a schedule but still grand total another column?
    By robinhill833400 in forum Revit Architecture - General
    Replies: 5
    Last Post: 2020-10-15, 07:31 PM
  2. 2015: Removing grand total line in schedules
    By jdunkerton689157 in forum ACA General
    Replies: 2
    Last Post: 2015-01-21, 04:34 PM
  3. Grand Total in schedules
    By Carlos GT in forum Revit Architecture - General
    Replies: 2
    Last Post: 2008-12-23, 01:59 PM
  4. Total Length in Material Takeoff
    By roy.70844 in forum Revit Architecture - General
    Replies: 2
    Last Post: 2007-11-21, 04:35 PM
  5. Count to grand total ratio in a schedule
    By Archman in forum Revit Architecture - General
    Replies: 6
    Last Post: 2006-11-17, 09:29 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •