Summary: The ability to add existing loads to a panel schedule without the need to add dummy equipment (Assuming the equipment is not in the part of the project you are working on) to revit to make it appear in Panel Schedule correctly.
Description: It would be nice to be able to Add Existing Loads to a Panel Schedule without having to add the equipment in plan.
There is an Assign Spare and Assign Space button in the Panel Schedules, but if you change the Value of spare to the name of the existing equipment and add a load to it, you get a "Spare" Load classification.
Looking for an Existing Equipment Load Classification and maybe an "Assign Existing Load" button for the panel Schedule.
Product and Feature: Revit MEP - MEP Electrical Panel Schedule - (Electrical)
Submitted By: Justin Mundy on 10/30/2014