Instructors: Josh Lowe, TURIS
Class Description: When BIM Models are given to the owner’s at the end of the construction, most owners have no plans to use. We will focus how models can save substantial time and money post construction; with an example from the Health Care community. This will demonstrate how a properly prepared model can effectively allow an owner to use the model to manage information through the life of the building.
We will show how maintaining existing documents is easier with Revit. We will highlight the waste that exists currently during the document maintenance process for an owner. Additionally, we will discuss what other uses for the model are. We will show how we can use the model to make better expenditure decisions to maximize payback of investments in modelling.