Instructors: John Tocci, Jr. with Greg Buchanan, Scott Adams
Class Description: Greg Buchanan, Scott Adams, Chris Chase and John Tocci (from GouldEvans, AECOM, SyskaHennessy, and Gilbane, respectively) will present a case study showing how an integrated team using Autodesk® Revit® Architecture, Structure, MEP and Navisworks® was used to successfully complete the design phase on a 695,000 square-foot $259 million courthouse in downtown Phoenix. Key components that will be pragmatically addressed are co-location, design phase challenges such as file size and transfers, drawing and sheet production, model-based quantity takeoffs, visual schedules, design model coordination, integration of the design models with Navisworks-based trade contractor MEP coordination, and model-based fabrication.