Results 1 to 1 of 1

Thread: MP118-2: Maricopa County Court Tower: A Case Study in Social BIM

  1. #1
    Autodesk, Inc. Autodesk University's Avatar
    Join Date
    2012-11
    Posts
    3,030

    Default MP118-2: Maricopa County Court Tower: A Case Study in Social BIM

    Instructors: John Tocci, Jr. with Greg Buchanan, Scott Adams

    Class Description: Greg Buchanan, Scott Adams, Chris Chase and John Tocci (from GouldEvans, AECOM, SyskaHennessy, and Gilbane, respectively) will present a case study showing how an integrated team using Autodesk® Revit® Architecture, Structure, MEP and Navisworks® was used to successfully complete the design phase on a 695,000 square-foot $259 million courthouse in downtown Phoenix. Key components that will be pragmatically addressed are co-location, design phase challenges such as file size and transfers, drawing and sheet production, model-based quantity takeoffs, visual schedules, design model coordination, integration of the design models with Navisworks-based trade contractor MEP coordination, and model-based fabrication.
    Attached Files Attached Files

Similar Threads

  1. Replies: 0
    Last Post: 2015-08-07, 05:23 PM
  2. 2015: case study roof
    By urbanista in forum Revit Architecture - General
    Replies: 0
    Last Post: 2014-07-04, 01:16 PM
  3. BIM Case Study Model
    By j.lee in forum Revit Architecture - General
    Replies: 0
    Last Post: 2010-07-25, 09:15 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •