Results 1 to 3 of 3

Thread: Can anybody help me understand why the areas in the schedule are different?

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Login to Give a bone
    0

    Default Can anybody help me understand why the areas in the schedule are different?

    Hi.
    I have the two photos of a schedule of takeoff quantities of 2 walls.
    The small photo is schedule of parts.
    Can anybody help me understand why the areas in the schedule are different and at the composite wall (straight with no angles) I cant find the result of the height moltiplicate the length? (At the simple, one component wall the result is straitforward).
    42m2 and 82m2 how they have been calculated?
    Thank you.
    Attached Images Attached Images
    Last edited by giovanni.ar.chi.tect754720; 2017-08-30 at 12:45 PM.

Similar Threads

  1. adding areas on schedule
    By ray salmon in forum Revit Architecture - General
    Replies: 4
    Last Post: 2009-06-03, 09:53 PM
  2. schedule areas of linked buildings
    By steedlei in forum Revit Architecture - General
    Replies: 1
    Last Post: 2008-11-19, 01:35 PM
  3. Schedule of areas
    By Wagurto in forum Revit Architecture - General
    Replies: 3
    Last Post: 2008-02-28, 05:45 PM
  4. Split the areas in Schedule
    By Mark Vorstenbosch in forum Revit Architecture - General
    Replies: 13
    Last Post: 2006-05-29, 12:24 PM
  5. Totalling areas in schedule
    By beegee in forum Revit Architecture - General
    Replies: 6
    Last Post: 2003-07-17, 03:52 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •