I moved the vertex near station 17+00 drastically to show what happened to the proposed grading model of the roadside ditch from station 18+00 to 18+50.
Why does moving a vertex of an alignment distort the proposed grading?
|
|
|
I moved the vertex near station 17+00 drastically to show what happened to the proposed grading model of the roadside ditch from station 18+00 to 18+50.
Why does moving a vertex of an alignment distort the proposed grading?