Hello all
Curious if anyone has been using MEP for small residential jobs (row housing, stacked townhouses, duplexes, etc.)? I’m wondering if there is any productivity improvement on smaller jobs where I’d be doing MEP for the whole building but the building is 6-9 residential units with maybe 2-3 different floor plans. Not sure if the training and setup time is any faster or beneficial than drawing the systems manually.