I am routing new pipe utilities,2+ utilities together in a single trench, and have the alignment as the center of the utility trench. Every 20+ feet we sometimes turn the trench and piping to take advantage of joint deflection in the piping system. The way our current template is set up every time we do this a station number is added at each joint deflection. We really dont want to show stations numbers on our plans or profiles at these locations as we would normally have a general note for the contractor to cover this. Normally we would only station beginning station,end station, fittings, valves and specific utility crossing based on easements and AHJ. Is there a way to only show specific stations along an alignment in plan and profile views?