I'm doing work on military bases, a lot of renovation and adding new facilities/buildings into built up areas, which means connecting to existing utilities.
In particular for sanitary and storm drain systems. The current crop of reviewers are requiring that the structure labels and tables explicitly label new incoming pipes as NEW, and the others as ABANDON, FILL, etc. Other than manually adding text on top of the dynamic pipe & structure tables, does anyone have a method that can help automate that? and minimize the probability of error creeping in?