I hope you can help or confirm if it was correct how I set up a linked project in Revit in the bim 360 cloud. I placed a main model to link into under a folder. Then placed 4 linked models in separate folders that link into the main model. There was a cad Civil file with no common point so I put a project point at sea level and a survey point on the corner of a bldg. I told the consultants to use the 4 linked models to work in and the main model for sheet setup and
views etc...the 4 linked models will now have mech. Struc. Linked in then linked to main. If this made sense is this the correct way to set this up?