Hi Every one, I Have a alignment which length is 112 meter but as per my requirement I have been started the chainage from 0+1.840 then incurrent will be every 10 meter so my next chainage will be 0+11.840 but when I have change the edit Alignment label for 10 meter my next chainage coming on 0+10.00 then increasing for every 10 meter

but my goal is first chainage 0+1.840 then 0+11.840 0+21.840 etc. I will be very glad if any body give the solution as soon as possible.

For your more understanding I am attaching the dwg here.