Hi,

I apologies in advance if this has been asked already on this forum, I couldn't find any solutions to the issue that I'm experiencing. I'm trying to create an electrical GPO fixture family in Revit. The main family host consists of multiple nested families of various electrical fixture types. I'm having issues in the scheduling of this family whereby the family is double counting the nested family and the parent family. Although I've selected "shared" under the Family Category & Parameters within the nested families and not the parent family, the parent family is still scheduling causing double counting. I have also setup a visibility instance parameter within the parent family to be able to switch on and off whatever GPO is needed which works great and reports as required in the schedule. The only issues as I mentioned is the parent family also reporting in the schedule. Is there a fix to this or something that I don't yet know of to fix this issue?

I've attached a few screenshots of the current setup. Thanks in advance.