I have recently started working on an apartment block. I am trying to get the masonry floor and wall sections to match that of the UK Part E Building Regs/RSD details. I have attached a current plan and section of what I have now and a very quick sketch of what I want to achieve.
Basically the floor I have is a screed on rubber on 150 plank with a MF ceiling below.
How do I get the block work to sit on the plank and cut the screed and also break the plank at the cavity. Also frustrated with the difficulty cleaning up the seperating walls on plan.
Thanks in advance