for example: i have used fields to accurately update areas as wall shift within the plan. however, i am now doing a light and vent schedule and am looking to enter the field into the table; which would also be eligible for updates. as of right now, basically i am stuck trying to take the field information from the xref and placing it into a schedule? any help?
the only alternative i guess i could go through would be to make the shcedule within each of the unit plans and then xref all those into one larger schedule. is that the sole solution? thanks.
keith