Originally Posted by
Joef
I apologize in advance for a simple question but I am stumped. I am trying to set up a new project so that the elevations reflect the survey. If I do the "relocate project" command everything moves but the datums still read 0'0.
I decided to run through the tutorial. I can't get past step 2 I cannot select the level so that the level properties appear in the options bar. Only the properties for the level head appear in the options bar. Right clicking and going to properties does not show an elevation base paramater. What am I doing wrong?
Perhaps I should just delete all the levels and create new ones based on the survey. Or lock them all and relocate them. I thought there was a faster way.