I initially had the structural elements (beams, columns, braces) modelled in my Revit Building file. The structural engineer i am working with started implementing Revit Structure at the beginning of DD and after he copied/monitored the structural elements and worked on them, he sent his model back to me. I deleted all structural columns, beams, and floors from my model and linked his model. The Linked structural columns, beams, and braces are OK, but linked floors don't clean to the Revit building walls. i ended up keeping the architectural floors and turning off the engineer's Revit structure Slab.
Is there a better practice to deal with this issue?
In addition structural framing members only show up in medium level detail. do i have to ask my structural engineer to adjust his families so i can see the braces in sections, elevations, and plans at coarse level details?
Thanks in advance for any input, it was really cool to meet a lot of you guys at this year's AU, my first - Mo