Originally Posted by
ckeelor
Our firm has a slightly different approach:
1. create the revision in the original plan and cloud/tag it.
2. add a new sheet with an 8.5x11 frame
3. crop the revised plan temporarily
4. export the revised plan to a TIFF
5. insert the TIFF into the new 8.5x11 sheet, print to pdf and send out.
No, the bulletin drawing isnt live, but it doesnt need to be.
This way, the revision is saved in the project and there is no reason to mess with duplicate views and no reason to mess with duplicate section cuts that arise from duplicating views. Plus, it's really easy to train the staff to do it.
Should we need to revise the bulletin drawing, we just go back to step 1 and delete our tiff.
Eliminates a lot of the headaches we were experiencing with the other methods.