    Question Major project revisions set up

    Does anybody have a methodology that works well when a project requires major revisions? I've already backed up the original documents to CD as a fixed point in the project.

  2. #2
    Super Moderator david_peterson's Avatar
    Join Date
    2002-09
    Location
    Madison, WI
    Posts
    5,687
    Login to Give a bone
    0

    Default Re: Major project revisions set up

    Sure, there's that E key on the upper right hand side of the key board. Usually when I get major revisions it seem to be easier to hit the E key followed by the A key followed by Enter.

    Are you looking more for how to handle clouds and such or just tracking? We ususally don't start clouding until after CD's have been issued for construction.

  3. #3
    100 Club
    Join Date
    2003-08
    Posts
    112
    Login to Give a bone
    0

    Default Re: Major project revisions set up

    Yeah, sometimes....Really just looking for ADT project management ideas to keep track of everything, and not get xrefs messed up. Inevitably we will end up at some point going back because the owner will say "I thought that was still in the project" or some other selective memory. Thanks in advance

  4. #4
    Super Moderator david_peterson's Avatar
    Join Date
    2002-09
    Location
    Madison, WI
    Posts
    5,687
    Login to Give a bone
    0

    Default Re: Major project revisions set up

    Then what you are doing sounds fine. Copy and re-name the project (in a different set of folder) for starters. We've tried a few things in the past, most had to deal with layering. I've heard of some poeple trying to accomplish this wih divisions, but I'm not sure that's the best idea.
    For layering, we'd cloud what was change, and name that layer with the date and who reqested the change. ie S-anno-revs-070123-"consultant/owner/engineer/architect" (pick one). We used the consultants or Arch firm name. At least this way when they come back with more changes to the same thing, you can at least be sure how changed it. You may never know the why.

  5. #5
    Time Lord Steve_Bennett's Avatar
    Join Date
    2015-12
    Location
    far, far, far away...
    Posts
    4,730
    Login to Give a bone
    0

    Default Re: Major project revisions set up

    A last resort to think about is if you are on subscription, Vault is free which will version your files and keep back ups of them (I think). If you decide to go this route GET HELP BEFORE installing and understand fully what you are getting into. Vault latches onto EVERYTHING on your computer and network and is very picky about what you do once it is installed. Data Management at its finest...
    Steve Bennett |BIM Manager
    Taylor Design | Adventures in BIM

Similar Threads

  1. 2012: Phased project & Revisions
    By amh in forum Revit Architecture - General
    Replies: 2
    Last Post: 2013-04-22, 01:52 PM
  2. First ACA project - revisions? xref bind CTDs.
    By Doove in forum ACA General
    Replies: 6
    Last Post: 2009-06-18, 06:29 PM
  3. Change Revisions to By Project late in the game?
    By ron.sanpedro in forum Revit Architecture - General
    Replies: 1
    Last Post: 2007-08-22, 01:15 AM
  4. Major Project Revision...Part 2
    By rkc in forum ACA General
    Replies: 1
    Last Post: 2007-02-01, 10:15 PM
  5. First major project
    By harkeychad in forum Revit Architecture - General
    Replies: 2
    Last Post: 2005-05-27, 05:52 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •