I'm drawing an elevator shaft and wanted to place a footing under a wall. The wall is a compound wall with a split region to allow it's finish layers to stop at a floor level while the cmu continues down.

When I place a footing (Structural. Foundation, Wall) on this wall. I get 2 footings.

I can imagine that the factory doesn't really know which region I would like to have the footing placed under; however, shouldn't there be a means of having one of the locations have the footing?