Page 2 of 2 FirstFirst 12
Results 11 to 15 of 15

Thread: Plumbing Schedule - Formulas

  1. #11
    Login to Give a bone
    0

    Default Re: Plumbing Schedule - Formulas

    I am seeing the same problem. The forumla works, but doesn't calculate correctly when working off a bunch of small rooms, since technically the calc is based on the total load for the occupancy B, and not each individual room.

    well, that sucks...any other ideas?

  2. #12
    Member
    Join Date
    2013-04
    Location
    Portland, Oregon
    Posts
    36
    Login to Give a bone
    0

    Default Re: Plumbing Schedule - Formulas

    Is there any resolve or solution to this???
    Does anyone have a schedule they could share???

  3. #13
    Member
    Join Date
    2013-04
    Location
    Portland, Oregon
    Posts
    36
    Login to Give a bone
    0

    Smile Re: Plumbing Schedule - Formulas

    OK fellow Reviteers,

    So here is the end result I came up with, it uses the 2012 IBC for reference. Please note that these formulas for the most part can be used in schedules as well. We chose a family because it more closely resembles our office standards. Have fun with it, If you use it, make it your own....

    Thanks Everyone for the Help!!!!

    BIM the World
    Attached Files Attached Files

  4. #14
    Woo! Hoo! my 1st post
    Join Date
    2011-11
    Posts
    1
    Login to Give a bone
    0

    Default Re: Plumbing Schedule - Formulas

    How can I add parameters for Unit Numbers and Provided Fixtures? I created the parameter and then linked it into your family but I gat an error "Failed to apply family parameters." I know it has to do with the generic annotation parameter that switches out the nested families, but I don't understand why I can't get it to work. I want to be able to have all of the info in one box since I am entering it manually any way.

  5. #15
    Login to Give a bone
    0

    Default Re: Plumbing Schedule - Formulas

    Hi. I am working on a project that has A-2 assembly and B and I want them in the same schedule using an area plan. I am using the formula for B group that is also being used for A-2 which is not right. I have attached a screenshot for you to guide me on how to go about it.

    FYI: Not all calculations are right. I am trying to figure out how it would work for one first.

    Schedule.png

    Formula that is not giving me right values.png
    Attached Images Attached Images

Page 2 of 2 FirstFirst 12

Similar Threads

  1. 2012: Room schedule legend scheme and formulas
    By kafka in forum Revit Architecture - General
    Replies: 4
    Last Post: 2012-04-18, 11:11 AM
  2. Need a Plumbing Fixture (was...Parameters and Formulas)
    By nsinha73 in forum Revit Architecture - Families
    Replies: 0
    Last Post: 2006-11-17, 12:46 AM
  3. Plumbing Fixture Schedule
    By CADMama in forum AMEP General
    Replies: 1
    Last Post: 2006-08-15, 05:24 AM
  4. Writing formulas for occupant load schedule
    By dmarch in forum CAD Management - General
    Replies: 6
    Last Post: 2006-05-03, 02:01 PM
  5. Formulas and schedule
    By CHRISTINE.S in forum Revit Architecture - General
    Replies: 4
    Last Post: 2006-05-02, 03:09 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •