    Hey everyone!

    Well i no longer need a hair cut cos its been torn out lol.
    Heres my problem, im working with a schedule table and all i need is to take the total from one column and find the percentage of the total from another column but do you think i can figure it out!? any help would be greatly appreciated!!

  2. #2
    AUGI Addict Mr Cory's Avatar
    Join Date
    2007-01
    Location
    Under a Rock over there
    Posts
    1,006
    Login to Give a bone
    0

    Default Re: Schedule Table total total

    Or if had another table which displayed the percentages

  3. #3
    Active Member
    Join Date
    2005-06
    Location
    Brisbane-Australia & Phoenix Arizona
    Posts
    80
    Login to Give a bone
    0

    Default Re: Schedule Table total total

    I noticed you have ADT2007.
    Does ADT2007 allow you to add a formula column to your schedule?
    I have ACA2008 and this version does have that function.
    If you have this capability in 2007, add a formula column and create a formula
    to calculate the percentage between the two other columns.

    Leo

  4. #4
    AUGI Addict Mr Cory's Avatar
    Join Date
    2007-01
    Location
    Under a Rock over there
    Posts
    1,006
    Login to Give a bone
    0

    Default Re: Schedule Table total total

    Yeah it does have formulas, i did have this set up which was fine but then i needed to get the total percentage and instead of getting an average of the percentages i was getting a total e.g. 897% lol

    Basically i have two coulumns which i have set to display to totals of each column. It is these totals that i need to find the percentage of, not the individual table rows. Sorry if im not explaining it very well

  5. #5
    Active Member
    Join Date
    2005-06
    Location
    Brisbane-Australia & Phoenix Arizona
    Posts
    80
    Login to Give a bone
    0

    Default Re: Schedule Table total total

    Don't think that is a possibility creating a formula for just the totals of the two columns.
    Not in schedules anyway. It is possible in tables. One for the wishlist.

  6. #6
    AUGI Addict Mr Cory's Avatar
    Join Date
    2007-01
    Location
    Under a Rock over there
    Posts
    1,006
    Login to Give a bone
    0

    Default Re: Schedule Table total total

    Yeah i'd say it is. Owell, i made a block with attributes and formula fields that does the trick. Thanks for your time

Similar Threads

  1. 2014: Can you eliminate a column grand total in a schedule but still grand total another column?
    By robinhill833400 in forum Revit Architecture - General
    Replies: 5
    Last Post: 2020-10-15, 07:31 PM
  2. Replies: 9
    Last Post: 2015-05-03, 07:12 PM
  3. Total areas and Total lenghts
    By z_ayri788300 in forum AutoLISP
    Replies: 8
    Last Post: 2012-09-25, 12:28 PM
  4. Getting the Table Schedule Column Total
    By buzz in forum AutoCAD General
    Replies: 4
    Last Post: 2009-02-10, 06:16 PM
  5. PSD's and schedule table column total
    By dhallett in forum ACA General
    Replies: 2
    Last Post: 2007-08-09, 05:57 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •