Structural columns should be separated into Steel Columns, Concrete Columns, Concrete and Masonry Piers, etc. for better scheduling. Footings should attach to the bottom of a pier instead of the bottom of the steel column. Now if the steel column is placed before the concrete pier footings attach to the bottom of the steel column and have to be moved to the bottom of pier.