So we had a generic layout for several floors of power and lighting. The power and lighting had been circuited and tagged. The client came back and asked us to an alternate design. “Sure no problem” so we created an alternate in design options. Then we selected all the components (-view dependant elements) and added them to our design option alternate. When we did this all of the circuiting was deleted. As was all the tags and load descriptions. Is this as intended? So now we have to go back and redo all of the circuiting. What is going to happen when the client decides on the scheme and I go to accept Primary? Is it going to remove all of the circuiting again?