Results 1 to 2 of 2

Thread: Adding Redline Tags

  1. #1
    I could stop if I wanted to
    Join Date
    2016-01
    Location
    San Francisco, CA
    Posts
    293
    Login to Give a bone
    0

    Default Adding Redline Tags

    This is what I get from the HELP in NavisWorks for teh redline tags.
    My question is how come the viewpoint isn't automatically created after I position the redline tag like it's stated at the bottom?? Thanks in advance.

    ***************************************
    Adding Redline Tags
    Redline Tags combine the features of redlining, viewpoints and comments into a single, easy to use review tool. This allows you to tag anything you want to identify in the model scene. A viewpoint will be created and you can add a comment and status to the tag. For example, during a review session, you may observe an item in the scene that is incorrectly sized or positioned. You can then tag this item, identifying the problem. This tag information can be saved into a NavisWorks review file (*.nwf) and distributed to the design team. The design team may then search the file, say for any tags of status 'new'. Once any necessary modifications are made to the drawing files, these can be reloaded into the *.nwf file and the tag status changed accordingly. You can review this latest version of the review file, ensure all tags have been resolved and finally 'approve' them.

    Adding a redline tag to the current viewpoint:

    Ensure the Redline Tools control bar is displayed as outlined in the previous section.

    Choose the Tag redline tool.

    Click in the navigation window where you wish the tag to be attached to.

    Click again in the navigation window where you wish the tag ID to be positioned. Both points will be joined by a leader line.

    If the current viewpoint is not already saved, then it will be saved automatically and named 'Tag View X', where X is the tag ID.
    ***************************************

  2. #2
    Active Member
    Join Date
    2008-08
    Posts
    89
    Login to Give a bone
    0

    Default Re: Adding Redline Tags

    Redline Tags work as advertised for me. NW Manage 2009.1

    1. Choose Tag from the Reline Tools toolbar.
    2. Click on the object of interest
    3. Click where the tag should be located.

    An Add Comment window is opened and a view named Tag View X is created, where X is the current tag number. If the comment is cancelled, then the view is automatically removed. Otherwise the view is saved.

    Joe M in WV

Similar Threads

  1. Adding Tags to Tables
    By dmanning in forum AutoCAD Civil 3D - Alignments
    Replies: 1
    Last Post: 2008-07-15, 07:28 PM
  2. Adding a Auto Mark and Tags Embeded
    By dtownsend in forum Revit Architecture - Families
    Replies: 3
    Last Post: 2007-01-30, 07:26 PM
  3. Adding wipeouts to room tags
    By scompton in forum ACA General
    Replies: 1
    Last Post: 2006-10-03, 08:28 PM
  4. Adding fields to Room Area Tags
    By Davied2 in forum Revit Architecture - General
    Replies: 2
    Last Post: 2005-01-20, 04:57 PM
  5. Adding New Parameters to Door & Room Tags
    By StephenVB in forum Revit Architecture - Families
    Replies: 1
    Last Post: 2004-05-04, 04:46 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •