I'm wondering what others are doing to break up their pipe systems, and how they are doing it. For example, I'll create a waste system for a stack of bathrooms. Then separately I'll create a waste system for another set of items, say an electric water cooler. At the bottom floor those 2 systems will have to connect together. As soon as I make that connection all the pipes, fittings, etc. from one system suddenly 'jump' to the other. The fixtures remain on their originally assigned system but everything else switches over. I've tried placing a union where I want the systems to diverge but nothing works. What exactly am I doing wrong here? Any suggestions would be great.